If you want to know what’s happening with the Interchange during construction, the 7-Day Outlook will tell you.
|
|
Paving
|
Location
Milling and repaving will close lanes and ramps at various times from 7 a.m. to 7 p.m. Friday-Sunday on Front Street between I-435 to east of Corrington.
|
Date and Time
October 28-30
|
Impact**
yellow (moderate)
|
Commuter Info.
Watch for detour signs
Give carpooling a try! RideShare Connection
|
Map
Click for google map |
Switchover to DDI configuration, temporary signal repositioning, lane striping
|
Lane closures and a ramp closure for brief periods to accommodate striping, signal repositioning and traffic switchover to new diverging diamond configuration the weekend of November 4-6
|
November 4-6
|
red
(severe at times)
|
|
|
| Pouring median barrier, islands |
The left lanes of eastbound and westbound Front Street will be closed to construct median curbs and islands. |
November 7-21
|
yellow (moderate) |
|
|
**Green: Minimal
**Yellow: Moderate
** Red: Severe